PipelinesDon Pipeline South Segment Project description: 23,000 linear feet (4.3 miles) of 36”, 42” and 48” pipeline that begins at the College Reservoir, heads east on Tierra Pintada St., then on 98th Street, under I-40, to Bluewater, then to 110th Street, connecting to the Don Reservoir. Consultant: HDR Contractor: Shumate/ERS Constructors Construction Start Date: Construction End Date: Major Streets Affected: 98th, Arroyo Vista, Bluewater, Central, 106th Street, 110th Street |