Pipelines
East Valley Pipeline - Second Street to Water Treatment Plant

Completed
Project
description: Approximately 15,150 linear feet (2.86 miles) of
72” pipeline that starts adjacent to the Alameda Drain at Second Street
south of Candelaria Road, extends north across Second Street, then
east on Candelaria to Edith Boulevard, then north on Edith to the Alameda
Lateral, northeast along Montano Road, than east on Montano to Renaissance
Boulevard. The pipeline stops at the south tie-in point of the discharge
line for the surface water treatment plant.
Consultant: BHI
Contractor: AUI, Inc.
Start Date: June 2005
Construction End Date: May
2007
Major Streets Affected: Candelaria, 2nd Street, Edith,
Montano, Industrial, Renaissance.
|