Pipelines
West
Raw Water Pump Station
Currently under construction
Project description: Located
on the northwest corner of the Bachechi Open Space, the raw water pump
station will be highlighted with a 32' parapet to add architectural interest
and will blend in with area homes and architecture. The pump station
will be fully xeriscaped, with minimal down-lighting, and will serve
as an access point to Alameda/Rio Grande Open Space. It will feature
special noise-dampening features and will be remotely operated to minimize
disruption to the area.
Consultant: Boyle
Contractor: RMCI, Inc.
Construction Start Date: June, 2006
Construction End Date (estimated):
January, 2007
Major Streets Affected: Construction vehicles will access
the site from the Alameda/Rio Grande Open Space, but no major roads are
expected to be affected.
|